US 34 Bypass Signal Timing Project - Greeley
Joe conducted a traffic signal timing project on this expressway on the south side of Greeley. Project tasks included collection of traffic count data; evaluation of intersection operations in the field; performance of cycle length evaluations; development of recommended cycle, offset, split, and interval timing; formatting the timing for W4IKS; reviewing the operation of the intersections in the field following the timing implementation; and preparation of a report that summarized the study process.
Back to Traffic Signals page