US 287 and 29th Street HES Conceptual and Final Design - Loveland

Joe managed this CDOT local agency project as well as designed improvements to the intersection to reduce accidents.  The final design improved the sight distance for left turning vehicles on US 287 to reduce left-turn accidents at the intersection, improved left turn lane queue lengths, and an upgraded traffic signal.

Back to Intersection Study & Design page