Bromley Lane / I-76 Frontage Road Roundabout Design - Brighton
Joe managed the design and was the traffic engineering task leader of a single lane roundabout at this four legged intersection adjacent to I-76. Elements of the design included conceptual design, refinement of geometry, preliminary and final design plans, and CDOT approval. Unique aspects of the project included retrofitting the geometry to the existing intersection with two concrete legs and two asphalt legs, low construction budget, and challenging schedule.
Back to Intersection Study & Design page